In the previous 26 years of our work, we prepared about 400 projects of different levels of development (concept, main and detailed designs) and about 100 technical studies. With this documentation we realized:

  • 800 km of gravity sewer pipelines
  • 100 km of pressure sewer pipelines
  • 250 units of pumping stations
  • 48 pcs of treatment plants with a total capacity of 130,000 PE
  • 135 km of water supply pipelines
  • 10 km of roads
  • 29 km of sidewalk
  • 1.3 km of bike paths
  • 5 bridges (up to 10 m ’in length)
  • 6 water steps
  • 2.5 km of rehabilitation and regulation of watercourse basins
  • 6.1 km of rehabilitation and elevation of watercourse embankments and retentions

The company is also active in preparation of the project documentation for application for the EU Cohesion Funds.

Up to now we have participated in the preparation of application for five projects:

  • agglomeration Pakrac-Lipik (as leading partner in consortium)
  • agglomeration Nova Gradiška (as member of consortium)
  • agglomeration Medulin (as member of consortium)
  • agglomeration Varaždinske Toplice (as member of consortium)
  • agglomeration Zagreb East (as member of consortium)

and several tenders and feasibility studies which included the work on the following EU projects:

  • Sisak, Čakovec, Nova Gradiška, Kutina, Varaždin, Varaždinske Toplice, Medulin, RWSS Zagreb County

 

Preparation of project and other documentation related to water supply and sanitation:

  • concept and main design of construction of sewer system for the agglomeration Suhopolje - approx. 25 km of sewer network with pumping stations (2016 – 2017)
  • concept and main design of construction of sewer system for the agglomeration Varaždinske Toplice - approx. 5 km of sewer network with pumping stations (2015 – 2017)
  • concept, main and detailed project of connecting the water supply pipeline Gaj - Dobrovac - approx. 7 km water supply pipeline (2015- 2016)
  • concept design, concept and main project of reconstruction of water supply and sewer system for agglomeration Pakrac - Lipik– approx.  25 km of water supply network and 23 km of sewerage networks with rain toppings (2013 – 2015)
  • detailed design of waste water treatment plant Suhopolje 9.000 PE (2013)
  • concept and main design of the sewerage network for agglomeration Pakrac – Lipik - approx. 27 km of new sewer network with pumping stations (2012 – 2016)
  • concept design of wastewater treatment plant Dobrovac (agglomeration Pakrac-Lipik) 13.500 PE (2013)
  • sewage water management model of agglomeration Pakrac-Lipik – approx. 80 km sewer system (2013)
  • water supply management model of agglomeration Pakrac-Lipik – approx. 180 km water supply system (2013)
  • concept design of wastewater treatment plant Novska 14.500 PE (2013)

Preparation of project documentation related to Flood Management:

  • ecological watercourse regulation of the Brzaja stream from km 4+200 to km 4+600 (2015)
  • ecological watercourse regulation of the Nakop II stream from km 0+000 to km 0+650 (2015)
  • ecological watercourse regulation of the Novska stream from km 6+538 to km 6+721 (2013)
  • rehabilitation of Ilova-Ilova channel and estuary in the river Ilova (2012)
  • ecological watercourse regulation of the Kumpf stream from km 0+000 to km 1+150 (2012)
  • protection of the left hinterland of the river Ilova from county road Kutina - Banova Jaruga to the railroad Zagreb – Tovarnik (2011)
  • ecological watercourse regulation of river Subocka and implementing of water engineering facility for water slope reduction of riverbed from km 11+300 to km 13+545 (2011)

Preparation of Feasibility study documentation:

  • regional water supply system of Zagreb County – Zagreb east: Dugo Selo, Ivanić Grad, Vrbovec i Sv. Ivan Zelina (2015 – 2017)
  • development of water supply and sewer system for agglomeration Medulin – Premantura – Banjole (2015 – 2017)
  • development of sewer system and purification for agglomeration Varaždinske Spa (2015 – 2017)
  • development of water supply and sewer system for agglomeration Lipik - Pakrac (2010 – 2014)

Preparation of Tender documentation (FIDIC „Red book” and FIDIC „Yellow book”):

  • construction and reconstruction of water supply, sewerage and wastewater treatment plant for agglomeration Krk (2015 – 2017)
  • construction and reconstruction of water supply, sewerage and wastewater treatment plant for agglomeration Nova Gradiška (2015 – 2016)
  • construction and reconstruction of water sewerage and waste water treatment plant for agglomeration Čakovec (2013 – 2014)
  • construction and reconstruction of water sewerage and wastewater treatment plant for agglomeration Sisak (2011 – 2012)